Showing posts with label The Big Hill. Show all posts
Showing posts with label The Big Hill. Show all posts

21 September 2016

CPR 1984 Lake Louise to Field



On Friday, June 1 1984 we boarded VIA Train Number 1 - after a stay at Chateau Lake Louise - and continued on a trip west to Vancouver. 

Using a car we rented at Lake Louise, we had spent a day or so travelling between there and Field - following trains as we could. During the few days we had at Lake Louise, we also enjoyed some of the many other attractions of the area. But this post is centred on a few photos I took on the way to Field.

from: CPR Annotated Time Table, Eastbound Edition, corrected to July 7th 1905.
While I have Canadian government topographic maps of the area and various other CPR tourist maps ... this rough effort on cheap paper from over 110 years ago does the nicest job of showing the details. 

You can see the Great Divide marked - from that point the water flows either to Hudson Bay or the Pacific. Lake Louise and the other 'lakes in the clouds' are shown nicely. This was before the highways arrived and the settlement patterns became more complex. 

During the era of the Big Hill, specialized mountain crews operated between the two locomotive terminals at Laggan and Field. After the Spiral Tunnels were in service in 1909, Laggan was no longer required as a terminal and the location was renamed for the nearby lake.


Unused postcard, no date.
Above, the old postcard provides a nice overview of the arrangement of the Spiral Tunnels. 


Below, a circa 1960 CPR descriptive pamphlet provides detail and data on the twenty miles we will travel.

Looking back in history, one would be hard-pressed to think of another
similar short segment of Canadian track or roadway which has received so much attention.

from pamphlet: Westward Across Canada by Canadian Pacific, circa 1960.
from pamphlet: Westward Across Canada by Canadian Pacific, circa 1960.

*  *  *

June 1, 1984


Lake Louise, looking timetable west.
Notice that that the original telegraph wires entered the rear of the station - as they generally did.



Our train will be following the original track alignment. Behind is a slightly longer, more 'gently' ascending track which will rejoin our route as we reach the summit at the Great Divide. While heavy freights hauling commodities to the Pacific benefit from the newer route, our train will have little trouble running up the steeper grade to the Divide. 



These photos are in chronological order - I checked the negatives. As soon as we could heave our bags into our opposite roomettes and slam the doors, we ran up to the 'cupola'. The dome was often staked out by people well in advance of the departure from Calgary. This dome community was generally thinned out by the time the train neared the Selkirks. 



Here you can see the lower Spiral Tunnel. 

After years of deferred maintenance on the rolling stock it took off CPR's and CNR's hands, VIA was only given 'life support' funding for its operations, and a lot of things were in poor repair. On one trip, our electrical system failed and our sleeping car was 'trainlined' with the adjacent car to the first point of repair at Winnipeg - we had minimal lighting. On another occasion, they had to shut our room's water off because we had a 'doomsday' toilet valve which would have quickly emptied the car's tank ... we were visited by carmen with plumbing skills in our own bedroom at Winnipeg.

On another trip, there was no steam heat through the night north of Superior. Clearly Rolly wasn't running that night. As a former steam fireman, firing up a steam generator probably enabled him to re-live the days of steam power. He took pride in his tale of the night that a VIA 'train rider steam technician' (yes, they had them - that's how bad things had become) couldn't satisfy the need for heat and Rolly went back and got the appliance generating to specifications.

... As bad-ordered VIA equipment relates to this trip: On the ex-CPR domes, the expensive custom Plexiglas front and rear corner dome windows had become very scratched - sometimes to the point of being opaque for photographs. The smaller front centre window (which carmen could open) had double panes of regular glass and you could get a reasonable shot through it. Westbound passenger trains were usually sent through a car washer, with a stop for manual brushing/scratching of dome windows, as Number 1 departed Calgary.

I have tuned these photos up as much as possible. Having photographed in the domes before, I was using an 80-200 mm zoom and fast film. You can often see light-coloured reflections in the glass in these shots.


Unused postcard, no date.

Here is an eastbound freight on an undated postcard.
Notice the fire damage. Back then, fires were often started by the sparks from steel brake shoes.


Detail from unused postcard.
I was curious about the consist.


Here is the valley (mud flats) of the Kicking Horse as it approaches Field.
The Trans-Canada Highway is the through road which you see.

Unused postcard, no date.
Here is a similar view of the Kicking Horse Valley.
This is a terrible image - and what was 'airbrushed' away in the left foreground?
But notice the water tank between the power and the valley.


I assume we are rolling by Yoho here.


By rail or road, this is always an interesting location for telephoto shots.

You can imagine trains of the 'Big Hill' era coming down something like the gradient of that road.


The eastbound freight is clear in the hole for us with its headlight extinguished.


I can hear Rolly saying it: "Straight Approach!"
Our power has not yet knocked down the light at the east switch, Field.

Officially, back then, this was known as an approach signal ...
but the 'straight' underlines with glee the idea that we are lined on a non-diverging route.

*  *  *

I tried to select a couple of passenger timetables with the most interesting details.

from: CPR public time table; August 15, 1936.
This late-Great Depression timetable shows three trains operating. While most working people were probably not doing well, the CPR still advertised its hotels and the nearby 'dude ranches' - someone, somewhere, still had money to spend. The 300-series 'motor trains' are interesting - Regina to Moose Jaw.  ... And 'meal stations' - mainly for people riding in the coach and colonist cars, perhaps.

*  *  *

from: CPR public time table; April 30, 1967 to October 28, 1967.
Don't blink, or you'll miss the short run of CP's Expo Limited. Both railways ran extra trains to accommodate people wanting to visit Expo 67 in Montreal (and/or to see Canada by train as a personal 'Centennial Project') ... during Canada's Centennial of Confederation. There are some nice photos and summaries of the mainly standard equipment used on this train which you can find on the internet.


18 May 2016

CPR 1909 Mallets for the Big Hill



When the only problem you have is a Big Hill, every tool begins to look like a Mallet.

At a railway show, I had the opportunity to purchase several snapshot images of a CPR locomotive I had not noticed before. It probably seemed 'necessary' to preserve this little collection and 'important' to understand the technology it represented ... Why would they build this odd thing?

It is quite possible that too much attention is paid to railway locomotive technology - at the expense of understanding other interesting elements of railroading ... the study of railcars ... the necessary crafting of freight 'backhaul rates' ... the evolving importance and tools of civil engineers through railway history in optimizing the track geometry of curves. A Trains magazine piece once expressed a preference for watching the railroad's big picture unfold at a dispatcher's desk, over the deafening numbness of a cab ride.

In the realm of preservation, it is disappointing when many examples of a rare locomotive design, or a highly promoted and thus 'famous' design, are preserved in museums - while the technology which really got the job done was not preserved at all because it was so 'ordinary' that no one wanted to preserve it.

This piece illustrates the perils of in-house locomotive design. Except for the high 'weight on drivers' pay rate it furnished, here is an odd locomotive design which was not beloved by those who nudged its cutoff levers into the company notch, nor the public, nor was it preserved, nor was it mourned by the railway's official historians. 

snapshot: CPR 1950 at Angus Shops, Nov 6, 1909

from Experimental Mallet article
This locomotive type was designed to be used in helper service in the Rockies and Selkirks. Introduced between 1909 and 1911, the engines 1950 to 1954 arrived after traffic was taken off the original Big Hill and run through the new Spiral Tunnels.

This was a compound engine design - having high and low pressure cylinders - as the steam was downcycled as it lost energy. Each side view shows one of each. The CPR designers thought they had a bright idea in placing the high pressure (smaller) cylinder so close to the low pressure cylinder it was feeding with its exhaust. 

The boiler-top box is an unconventional superheater which was unique to the 1950.

snapshot: CPR 1953 at Field BC 1910
The odd attachment to the 1953's smokestack above is designed to swing over the top of the stack, to divert the exhaust blast so it doesn't damage the roofs of tunnels. As it diverted the smoke into the faces of the crew, it didn't see too much use.

In 'Canadian Pacific's Big Hill' by Floyd Yeats (BMRNA, 1985), he quotes his father, also a railroader at Field, regarding the unpopularity of these locomotives. Without pilot wheels, they were prone to derailing on sharp curves. Because the Mallet's 'two engines' each turned under the rigid boiler, but shared steam pipes - steam leaks often developed which impaired visibility.

In addition, this unusual design probably created orientation problems for engineers and firemen when they were first assigned to operate it. It would also take a while for crews, collectively, to work out the best techniques for getting the maximum output from the power. And if you look under the boiler, it looks like some plumber's nightmare - so finding and fixing problems, like steam leaks, must have been a headache for shop staff. 


snapshot: CPR 1953
*  *  *
*  *

The following links lead to articles published about these CPR Mallets. They were sent to me some time ago by Jim Christie. Through his skill and persistence, Jim finds and saves links to these century-old journal articles preserved at archive.org . These articles allow us to read about these old technologies in the present tense and they help us to understand why they were designed and how they were used.

Format below: I am presenting the publication name and date, the link text to the article page view and an image taken from the beginning of the article. This presentation is unpolished by design to provide a backup against broken links in the future. If you use the link text below to reach the page view mode, and wish to download the whole very large publication, you can click on the title link in the top left corner and choose a format to save.
*  *  *

American Engineer and Railroad Journal, February 1910
https://archive.org/stream/americanengineer84newy#page/81/mode/1up



Image from the article.

*  *  *

American Engineer and Railroad Journal, July 1910
https://archive.org/stream/americanengineer84newy#page/301/mode/1up



*  *  *

A third article documents the unique 1955 which was outshopped in October 1911. Unlike the other five of this class, the 1955 was 'simple' - having four pistons of the same size. You'll recall that the 1950-1954 were compound engines with high and low pressure cylinders.

American Engineer, July 1912
https://archive.org/stream/americanengineer861newy#page/347/mode/1up



Image from the article.
*  *
*  *  *



snapshot: CPR 1955


snapshot: CPR 1955
*  *  *

As the article above states, this Mallet design gave 'excellent results' in pusher* service ... in fact so excellent that they were modified circa 1916/1917. The results of these slight tweakings can be seen in a couple of snapshots below.

* Note: Any helper used anywhere in a train is a 'pusher' in CPR steam-age parlance. 
I learned this the hard way after visiting the Horseshoe Curve in Pennsylvania where they attached pushers on the tailend ...
Rolly Martin was telling me 'the story of the auxiliary which was ordered 20 minutes before the collision occurred between Selim and Schreiber' ... The steam 'pusher' had taken the [authority equivalent of a restricting] signal ... Later, the eastbound passenger train arrived on the main track and they coupled ... They then proceeded up the hill to Schreiber without authority - the passenger train assuming a clear signal. But the pusher hadn't received a clear signal. Meanwhile, the dispatcher at Schreiber had cleared a westbound freight at Schreiber and it had departed ... When he discovered that the passenger train had proceeded eastbound from Selim, the dispatcher [helpless to stop either train] immediately ordered the auxiliary ... 20 minutes before the collision!
"Wait ... so where was the pusher when they left? ..." 
" ... Repeating myself !! :  ... " 
It took a couple of reiterations of the story before we negotiated the meaning of 'pusher' between us. The passenger train had come upon its helper sitting on the main track. The helper had previously taken the signal. The passenger train coupled to the helper's tender and off they went.
(an illustration of why watching the dispatcher is better than a cab ride) 
 * * *
Oh, and here is what the tweaked Mallets looked like:


The 'class engine', the former 1950, is seen as 5750 at Toronto in 1934. 
It was scrapped in October 1958.


snapshot: CPR 5754, ex CPR 1954

The former 1954 is seen as 5754 at John Street in Toronto in 1934.
It was scrapped in July 1960.

*  *  *

Back when this new technology showed such promise ...

snapshot: CPR 1952, no date, no location

Probably at the very end of the idealized Edwardian era, here is CPR 1952, attended by its crew and some large, important watch chains. It is possible that the round-roofed car on the engine's tender is a dynamometer car. Here is a dynamometer record for the CPR 1950 from Jim Christie's first article above to suggest where and when this snapshot might have been taken.







13 May 2016

CPR 1909 Brakes on the Big Hill, Part 2 - Freight Trains

Canadian Northern yard, Saskatoon, Saskatchewan, mailed 1917.
The postcard view above was probably taken sometime shortly after 1900 and hand-coloured. A passenger train is arriving at the station. The railway is not the CPR, but the view shows the wooden construction used in freight cars and the varieties of equipment then in use.  Although the colouring process obscures them, the roof-mounted brake wheels can be seen in most cases. This is the type of freight equipment which would be transported up and down the Big Hill near Field, British Columbia.

Operating rules and technology on the Big Hill were focused on the critical mission of maintaining passenger train safety above all. However, most of the CPR's revenue through the area would come from the transport of freight. This post looks at the processes and technology used for the safe movement of freight before the opening of the Spiral Tunnels in late 1909.

*  *  *

The card to which this print is glued states this is CPR 376 at Field in 1886. One source states that this wheel arrangement was so rare in its use at Field that it doesn't warrant being mentioned. This 'perfect' wheel arrangement of that era can be contrasted with the following power.


from: West of the Great Divide; Robert D Turner; 1987; Sono Nis Press.
A Baldwin-built locomotive which was purchased for Big Hill service is shown above. It was probably photographed around 1890. The oil headlight and the fact that the locomotive has two sand domes are interesting details. One source remarked that the wooden pilot was handy because if a rockfall was struck, any locomotive entanglement could be resolved with an axe - rather than causing a longer delay on the road with a bent metal pilot fouling the track.

This locomotive is fitted with air brakes, which came into use after traffic had started operating on the Big Hill. The steam-operated air pump is just in front of the cab, with the main reservoir located under the engineer's position in the cab.

Earlier in Big Hill history, individual car handbrakes (only) had been used to control train speed - in conjunction with any braking technology available on the locomotives ... such as manual tender brakes, straight air brakes on the drivers and/or using the locomotive reverser (steam cutoff). There is no definitive source which chronicles exactly when particular technological advances were made on the Hill, partly because it was a gradual process with the railway using its usual method of derating and downgrading older equipment for less demanding service as better equipment became available. 

On the theme of getting along with imperfect technology ... it was a normal practice of the time that cars with air brakes would be marshaled behind an air brake-equipped locomotive so a continuous trainline, operated by the engineer leading, could be established ... then the rearmost cars - lacking air brakes - would be controlled with handbrakes.

My interest is in this particular photo stems from the fact that it shows a link and pin coupler system with a link actually in place and ready for use. You can see that the pin has been inserted above and then through the link to hold it in place. To mate with a higher coupler, the other slot could be used. 

To couple to a car in front, a trainman would have to position himself between the locomotive and the car ... guide the link into the car's slot by hand, and drop the pin at the precise instant it could capture the link at the car's coupler. If something went wrong, fingers could be lost at the coupler or the trainman could be crushed between the equipment. 

... With old photos, we can keep in mind the fact that railway locomotives were used in all weather and lighting conditions - in contrast to the cameras of the age.


I believe that the device tipped back at a 45 degree angle above the pin is a pushing buffer which could be dropped forward to provide a pushing surface without the complication of coupling the locomotive to the rolling stock being pushed.

*  *  *

Here are a couple of random discoveries to suggest why this route with its troublesome grades was selected over the easier grades of the Yellowhead Pass. Some writers of Canadian history have suggested that it is an enduring mystery why Van Horne et al selected this southern route - over the previously favoured 'Canada Pacific' route used later by the Canadian Northern, Grand Trunk Pacific, and ultimately Canadian National. It is probably not a mystery ...

from: Toledo Blade, May 21 1908.
After finding that curious article, I perhaps found the date of this event:

In Commercial Canada (published c1922), a lavishly illustrated hardcover book which promotes those provinces, cities, industries and companies willing to purchase their own advertorial sections, there is a chronicle of significant dates in Canadian history. For the date April 21, 1891 is the following entry:
The first of the new CPR steamers arrived at Vancouver from Yokohama, beating the record by over two days. The mails were landed in Montreal in three days and 17 hours from Vancouver.
... It seems possible a US railroad/Grand Trunk Railway combination may have had the previous mail contract.

The CPR Syndicate intended to fight for every bit of Empire business they could get, by forming a land and ocean bridge between the Far East and Britain using their own ships and rails. As well, building close to the border via Field tended to make it easier to beat back cross-border advances attempted by JJ Hill's Great Northern Railway or any other American line trying to siphon away Canadian traffic.

*  *  *

Safety Appliances

While looking for early CPR records in an 1887 edition of the Official Guide, I found two interesting articles about the efforts to select and standardize key safety appliances for use on US railroads. 

These same technologies were quickly embraced on the CPR's route down the Big Hill.

from: Official Guide; December 1887; National Railway Publication Co. collection of LCGagnon
Apparently, during this era, there were many manufacturers of the Janney type of coupler. When cars were received through interchange in the US, the receiving railroads were having trouble maintaining the necessary stores of proprietary spare parts to repair Janney-type couplers which failed on these 'borrowed' cars. Eventually, it was expected that spare parts would be interchangeable.

Janney couplers (fundamentally the same as those used today) were not as much 'automatic' as they were 'remote control' ... there was no need to adjust them in any way while equipment was moving. With the link and pin type, an employee had to move between cars when cars were being coupled ... and to uncouple, an employee would often have to wait for slack to remove a pin.

*  *  *

from: Official Guide; December 1887; National Railway Publication Co. collection of LCGagnon
This test data is interesting to read. In contrast with the non-automatic nature of so-called 'automatic couplers' ... Test 7 above reflects the valuable characteristics of the 'automatic air brake'. That is, if a coupler fails and the train separates, the brakes apply to all cars automatically as the train line pressure break initiates the emergency brake application on all cars.

*  *  *

Getting Back to Field

from: Souvenir of My Trip through the Canadian Rockies on the CPR. No publisher, no date.
The scale of the country dwarfs the railway operations around Field. 

Today the Trans-Canada Highway and most of the traffic are to be found on the left side of this photograph - on the opposite side of the Kicking Horse River flats. When this photograph was taken, only the horse stables used to support local commercial travel and tourist excursions were found opposite the town site on the other side of the river.

from: Souvenir of My Trip through the Canadian Rockies on the CPR. No publisher, no date.
A dining hall for passengers was built near the small Field station during the first summer of passenger operations. Mount Stephen House (a CPR hotel) in its final version - seen above - was completed in 1901. 

In the photo above, Mount Stephen House is the large building at the left, with the Field station and its two gabled dormers between it and the camera. The dining hall is the 2 1/2 storey building mid-way between Mount Stephen House and the roundhouse. After the development of Mount Stephen house for tourists, the dining hall continued to serve meals to railway staff around the clock.

*  *  *

I am repeating the timetable and footnotes section for the CPR 'Mountain Section' here as some details are referred to in the freight train rules which apply to the Big Hill.



*  *  *

Here are the rules which apply to freight trains on the Big Hill


Rule 4 requires a unique 'running brake test'.
'Water brakes' are described in this supplementary posting: Water Brake - Used on the Big Hill


To summarize the rules for descending freight trains: ... When things were functioning normally, each (total: three) section of downhill track guarded by/ending with a (total: three) Safety Switch was a block which could be occupied by a train. But, with the key condition being that: the train ahead must have cleared the next Safety Switch ... before the train following it could pass the Safety Switch being viewed by its headend crew.

... Knowing that a preceding train had cleared the next safety switch downhill, was intended to ensure that any potential runaway was ALWAYS facing its own diverging Safety Switch, with no possibility of hitting the rear of another train.

from: Van Horne's Road; Omer Lavallee; 1971-1981; Railfare Enterprieses Ltd

After the Third Safety Switch, a fourth control point (for freights) was at the 'tunnel in the shoulder of Mount Stephen' (Rule 12: "tunnel 13.1") - the postcard image is repeated below. On the track section beyond the Third Safety Switch, the grade was reduced. It was here that the descending train would stop until its wheels were sufficiently cooled and the shack pictured below was perhaps the location from which the crew would advise the tender of Safety Switch Three that they were departing the area for Field.


Don't worry too much if you can't decipher this last page ...


It seems the actual physical characteristics of the staff system will remain a mystery for a while. It does not seem to resemble the staff system put into operation in the Ottawa-Hull area by the CPR around 1915 after a significant collision there (in which my grandfather and his siblings were passengers).

In books published about the Big Hill area - the authors of which having done much more research than I have - the text tends to just quote and/or rephrase the rules above without actually elaborating on how the staff system connected with any electrical receptacles and without providing further details on its operation. ... For workers at Field, the physical characteristics of the staff system would be seen before individual workers would require the necessary fluency with its rules above, and before they assumed responsibility for operating it. Working backwards from historical procedures with no artifact or diagram can lead to dead ends.

In Special Rule 5 above: Rule 91 in the Standard Code of 1902 requires 5 minutes between freight trains.

In Special Rule 18, the formal 'Kicking Horse Grade' of the title is obligingly referred to as the Big Hill.

*  *  *

The following article, published in the 1920s, harkens back to events which occurred during the era of the 4.5% grade of the Big Hill.

from: Montreal Gazette; June 12, 1924.
The undated image above was printed by a Montreal postcard company. A couple of days after posting this, I was visiting a local bookstore. In a recently published 'coffee table book' I happened to find the original black and white image from which the postcard was painted. The unmatched road numbers on the number plate and tender don't match the actual number plate in the original photo.


In the Janney-type coupler knuckle on the engine's pilot, you'll notice an adaptation of new technology to accept the old. The slot in the coupler knuckle could receive an old-fashioned link and a pin could be dropped into the knuckle to secure it.

*  *  *

While the coming and going of passenger train names, consists, technology and schedules was celebrated in advertising, postcards and newspaper articles, scant attention was paid to the scheduled freight trains running on the Big Hill: Number 71, the Coast Freight, and Number 72, the Seaboard Freight.

... So here, without even a Whymper, ends a partial interpretation of the technology and processes used in freight service on the Big Hill.