Showing posts with label B unit. Show all posts
Showing posts with label B unit. Show all posts

13 April 2018

Alco FA-2 Operating Manual from 1951, Part 2




Here is Part 2 of the FA-2 operating manual. Whether you want to deal with a ground relay or bring a unit back on (the) line for the ruling grade, you're sure to find the index at the back quite handy for all your on-the-road troubleshooting.

Rolly also had a story relating to these units in their old age ...




















from booklet: 10 Souvenir Picture Postcards, North Shore of Lake Superior; no date; CPR News Department. Price 50 cents.
Waiting for Nicholas Morant to get his photo, a westbound led by an FA-1 is photogenically waiting at Jackfish Tunnel. In the cab there seems to be the period's normal staffing complement of the engineer, fireman and headend trainman. The snow in the knuckle pocket speaks to the snow and drifts met on the way ... there are very few road crossing snowplow windrows to be encountered on this section of the line. The telltale over the second unit deserves to be noticed as well.

Looking very closely, the van and locomotive are so perfectly positioned. This might be a coincidence, because one wouldn't expect a train length to be custom-designed for a photograph. If one wanted to get the power and the van precisely in the right spot, one could always spot the van, cut the train behind the tunnel, and then spot the power.


*  *  *

Living in a Small Railway Town


Pictured above is Nipigon in an undated Oakman postcard photo. At the top of the photo, the track leads eastbound. The fill of the former Canadian Northern line to today's Thunder Bay can be seen at the right margin.

In 1977, I encountered some full carbody bell-ringing B units still in service along here. As an inexperienced spareboard trainman, I was quickly briefed by the engineman on what to find and what to do when I got back to the offending unit. If no significant grades were ahead, the unit might just be taken off line to silence the bells. The ones I walked through had portholes, so I assume today that they were F7B's.


In the mid-1990s, Rolly told me a story of a slightly earlier time - probably the early 1970s - when he was running an eastbound freight which was put in the siding you see here at Nipigon. I just double-checked and the departing freight was sitting on a grade - consistent with the story.

The first time I was told this story, I think we were looking at a book with photos of FA's in it - identical or similar to the subject of this manual. That is why I am including it with this post. Rolly pointed to the units and noted that he had some of these 'old cows' in his locomotive consist.

... So the time has come to head east and Rolly was having no luck getting his train to move. Maybe the journals (as applicable) were too cold, maybe the units were 'tired' and no longer capable of their rated horsepower, maybe a sander wasn't working properly. There are so many possibilities. 

Just like an engineer is singled out when a knuckle breaks ('bad train handling') he feels singled out when he can't get going ... the dispatcher wonders what his failure is. In answer to one of my train handling questions, Rolly once told me you don't have rush in and try to stop right at the light (as long as you clear) ... but when you get your light "Get goin'!" as Rolly put it.

In great frustration, and as a last resort, Rolly probably used the steam era practice of starting the train one car at a time - by reversing to gather some coupler slack before pulling forward. I emphasize he had great frustration with the 'old cows' which were incapable of doing what CP Power Control promised they could do. And he was trying to start on a grade and on a long, mainly gentle, curve which probably added a bit of extra 'wheelage' to his challenge.

I am being conservative in remembering these details ... I think his last effort at "hogging her out" resulted in 3 broken knuckles and 1 broken drawbar. The Master Mechanic was in the neighbourhood and he made a courtesy visit to the cab: "You've made a hell of a mess, Rolly!"

Here was a unique aspect of living in a small, remote railway division point ...

Rolly's spouse Theresa went to the Schreiber station (division headquarters) on the following payday to pick up his cheque.

The clerk looked through the envelopes and told Theresa there was no pay for Rolly.

She was very puzzled - there must have been some oversight?

The clerk replied: "Rolly has to pay for the damage!" ... paused to let the joke sink in ... then he handed Rolly's pay envelope to Theresa.


07 April 2018

Alco FA-2 Operating Manual from 1951, Part 1




Here is another First Generation Diesel-Electric manual. A nice illustration of a hostler's station (for B units) is included. Where helpful, illustrations have been enlarged and repeated after their original pages of text. 

Consider the employees using these manuals. They had Company and/or manufacturer training ... and trips with manufacturer representatives on board for the earliest runs. However, these employees were accustomed to steam locomotives. 

An unusually friendly and welcoming subheading under Throttle Handling (Page 23) ... is 'How it Works' ... as if this were a new household appliance! "Hey kids, do you know how a spin washer removes excess water?"
Having written that, I checked the Operating Manual for the M-630 and M-636 (printed Jan 1970 - 19 years later). One comma was missing, but the 'How it Works' paragraph is identical!
... A great amount of care probably went into the language used in the manual to keep it economical, clear and simple - to ensure the workers would successfully adapt to the new power, and so more units would be purchased from this particular manufacturer.

Contrast this to the legendary (perhaps imaginary) railroader culture of steam: 'If you don't know what a[n unlabelled] lever, valve or gauge does, you don't belong in my cab!'

Some railroaders contemptuously likened first generation diesel operation to driving a bus. The cab was nice and clean and sealed from the weather. The potential human-searing and human-rending brute forces of the beast were generally sequestered within castings and behind cool-to-the-touch shiny painted sheet metal. And lo and behold! ... at the end of a run, you were still relatively clean!

... This idyllic state probably lasted for a few years - maybe until the first photos of primitive mainframe computers bumped the photos of early diesels from 'Annual Report Service'. 

As the units aged; as their frustrating idiosyncrasies became known; as they began to leak fluids and ring bells; as the different locomotive breeds fought with each other (if they could be mu'd at all) ... engine crew members found a new and slightly different calling from their steam predecessors. The honourable professional badge of getting dirty at work returned. 

If you are invited to run a nice clean 'bus', enjoy it while you can.

Grandfathered - some said featherbedding - steam fireman found new, useful work as diesel firemen ...

While the engineer concentrated on staying on schedule; grabbed stripped and pitched order hoops on the fly; then modified his previous mental map of the train's meets; noted the lead engine numbers of all trains encountered and observed all 'signals displayed' by them; made up time; watched everywhere for fusees and flags; looked back for hotboxes; guarded against low air and high speed; whistled from the post for every crossing until fully occupied; kept the day's new slow orders in mind; watched for trackside Company Officials hoping to delight the crew with the surprise of a friendly wave and a later note of thanks for a job well done; made unofficial modifications to speed limits to avoid stalling or doubling on grades when over tonnage - yet again; tried to determine which distant flickering star in the Yard Constellation was associated with the life of his own trainman and the possible loss the engineer's pension ...

While these and a few other things were occupying the engineer on a typical day ...

Perhaps he had some confidence that his defective, idling unit - four locomotives back - would be deliberately brought back to life at exactly the right moment ... and that it would pull for at least a few minutes before failing again ... so the train's ascent of the ruling grade could be made.

Before train-to-wayside radio everywhere, with only a paper operating manual (like that which follows) and on-the-road experience as resources ... locomotive failures were often being fixed at essential times without stopping trains. 

... Those 'redundant diesel firemen' were still making their trips while waiting to be 'set up' as engineers ... and they were doctoring failing units to prevent on-the-road delays.


*  *  *




from: Illustrated Treasury of MLW-ALCO to Bombardier Locomotives; James W Kerr; 1983; DPA-LTA Enterprises.
A builder's photo of an FA-2 from 1951.























End of Part 1